Crack Sealing Streets in South Windsor

South Windsor - During the weeks of August 14th, 2015 through September 15th, 2015, crack sealing will be done on various streets in South Windsor.

The crack sealing process will consist of air cleaning cracks in the pavement one half inch wide to an approximate depth of one half of an inch. The crack will then be filled with a hot elastic type rubber compound. Some of the streets that have been sealed previously will be re-sealed with the same material.

Traffic will be maintained during this program however there may be delays in traffic near the work zone.

If you have any questions or concerns, you may contact the Street Services Division of Public Works at 860-648-6366, Monday through Friday, between the hours of 7:00a.m.and 3:30p.m.

Ahern Dr.
Apple Tree La.
Aroda Dr.
Avonwood Dr.
Birch Rd.
Bourbon St.
Bramblebrae
Deming St (150’ East of Ridge to Oakland)
Devonshire Dr.
Dogwood La.
Felt Rd.
Fitch Meadow
Governors Hwy (RT 5 to Main)
Gulley Dr.
Highland Dr.
Hillside Dr.
Jeffrey La.
Kennedy Rd.
King St.
Larkspur La.
Miller Rd. (Ellington to Stonefield)
Murray Rd.
Newberry Rd.
Patria Rd.
Peach Dr.
Pine Knob Cir.
Pine Knob Dr.
Saginaw St.
Schweir Rd.
Steep Rd.
Strong Rd.
Troy Rd. (Brookfield to Rye)
West Rd.
Windshire Dr.

AttachmentSize
PDF icon 2015 Crack Sealing Map687.03 KB