Chapel Road Area Sewer Lining Project - January 2021

The Town of South Windsor Pollution Control and their contractor Insituform will be conducting a sewer lining project in the Chapel Road area.

PLEASE TAKE NOTE:

During certain phases of the operation you may detect an odor.  Odors are most likely to occur in buildings with dry or non-existent traps.  In most cases, any odors can be minimized by pouring one or two gallons of water down your unused plumbing fixtures (sinks, showers, toilets, etc.) and basement floor drains. In the event you detect odors in your home you should notify the crew onsite and open your windows for ventilation.

Appropriate traffic control measures (cones, signage, Uniformed Police Officers, and Flaggers) will be in place.

All driveways will not be blocked off.  True Blue Environmental Services will be making every accommodation to maintain access to residential and commercial properties. 

If you are connected to the sewer system, your service will not be suspended.

Insituform will inform property owners along the construction route of anticipated work schedules so as to cause minimal inconvenience during the project duration. 

For more information regarding any of this work please do not hesitate to email Tony Manfre at Anthony.Manfre@southwindsor-ct.gov or call (860) 644-2511 x247.